2016年4月14日星期四

bidge gantry crane


chinacoal03

https://www.chinacoalintl.com
https://m.chinacoalintl.com/

Email: chinacoalservice@gmail.com 
E-mail: zhongmeixx12@gmail.com 

bridge gantry crane
bidge gantry crane


Bridge gantry crane Introduction
Gantry crane hoisting mechanism, trolley traveling mechanism and bridge structures, basically the same with bridge crane . Because large span, crane operating agencies mostly used driven way to prevent the crane skewed operation and increase the resistance, or even an accident. Gantry crane lifting trolley running on the bridge, and some lifting trolley is a arm crane. The legs on both sides of bridge are generally rigid legs; span of more than 30 m, it is often the one side of the rigid leg, and the other side of flexible leg Through the ball joint and bridge connection, made the mast to be a statically determinate systems , to avoid the additional stress caused by lateral thrust under external loads , can also be compensated bridge temperature ,in order to prevent the strong wind down the line or tip over, with wind measurement instrument and crane rail clamp.
Capacity
T
50/10
75/20
100/20
Span
m
7.5~31.5
Lifting height
Main hook
m
12
20
22
Aux.hook
m
16
22
22
Operation method

Pendent control,wireless control,cabin control
Speed
Lifting 
Main hook
m/min
5.9
5.5
3.53
Aux.hook
m/min
13.2
9.23
7.2
Cross travel
m/min
38.5
38.4
33.86
Long travel
m/min
74.6
65
65.6
Lifting mechanism
type
 electric winch cart
Working duty

A5,A6,A7
Power supply
AC
220/380/400/415/460V,50/60Hz, 3P

没有评论:

发表评论